07/16/2026
⚡ WE HAVE POWER! ⚡
After 4+ months of planning, installing, and energizing our brand new utility pole, Counter Culture officially has electricity on site. Huge milestone.
That means we can finally get the flooring and woodwork installed with the lights ON — and yes, those lights include these fixtures that are giving us all the vintage diner feels 😍
About 3 more weeks of build-out ahead, and we’re aiming to open our doors late August / early September. Getting so close.
Thank you all for hanging in there with us through this ride. It’s been a long road to get the power turned on, but every step forward means we’re one step closer to feeding you again 🌱