05/05/2022
Current progress: Plants added to the water feature. Ivy sprigs are in the greenhouse and will line the top of the water wall. Load in room and drive through kitchen floors were acid stained and finished with epoxy. Framed up the concrete counters and seating, ready for concrete. Gary Ruud and his son Brad have been selected to build the live edge table tops while Jason welds the table frames. Never ending clean up as each project is finished.