09/19/2026
Another Taco Casa Bryan progress report. 👀
This week, we lit the place back up. 💡
ABC Electrical came out and replaced all of our exterior wall pack lights around the building. (Except those two above the drive thru; we were busy! 😅)
This probably isn’t the kind of upgrade anybody is going to get overly excited about. 😂
But it’s exactly the kind of stuff we’re talking about when we say we’re working our way through this building.
Better lighting. A brighter parking lot. A building that looks cared for when you pull up at night.
Since taking over, we’ve been tackling the big things, the little things, and a whole bunch of things that probably should’ve been handled a long time ago.
Doors. Equipment. Technology. Cleaning. Lighting. Operations. One thing at a time.
We’re nowhere near finished.
But drive by Taco Casa Bryan tonight and take a look. She’s starting to shine again. ❤️🌮
Big thank you to ABC Electrical for getting us taken care of!
What should we tackle next? 👀